$1.5B London Tunnel Team Saves Time Using ‘Air Skates’ for Boring Machine U-Turn October 30, 2023 News Cross passages between both bores of London’s 0.7-mile Silvertown tunnel are nearing completion, marking the end of excavations on the River Thames crossing. Share: admin Administrator Older Post First Pedestrian Cable-stayed Swing Bridge in US Coming in 2027, Says Team Newer Post Army Corps to Require Design Teams to Consider Mass Timber