Call us: 301.738.5690

Project: Friendship Technology Prepartory Academy

Project Details

  • Owner: Friendship Public Charter Schools
  • Project Size & Type: New School - Fast Track, Design/Build
  • Address: 120 Q Street NE
    Washington, DC 20002
Contact Us

Project Description

Size & Type of Project – New School - Fast Track, Design/Build

Friendship Tech is a new secondary public charter school adjacent to the Saint Elizabeth’s campus in SE Washington. The new school is three stories plus penthouse with an underground parking garage and consists of approximately 74,000 gross framed square feet. The building is concrete framed utilizing 5,500 cubic yards. The school has a green roof with LEED Silver certification pending and was designed to be the first “green” school in the District.

The new facility is a college preparatory S.T.E.M. school focusing on science, technology, engineering and science and accommodates students grades 6 thru 12. Students can earn a high school diploma as well as college credits

MCE Scope of Services

Meyer Consulting Engineers was the Structural Engineer of Record for all phases of the project. The work proceeded under a fast track, design/build format with the team led by Turner Construction. Schematic design began with a structural systems feasibility study in March 2012. Construction documents were completed in September 2012. The permit was expedited using the District of Columbia self certification process. Construction began in October 2012 and was completed in July 2014 at a cost of $35.7 Million.

Key MCE personnel include Lawrence S. Nagielski P.E. (Principal-in-Charge/Design Quality Assurance), Sanjoy Bose, P.E. (Principal-in-Charge/Production & Project Manager), Terrance Cox, E.I.T. (Project Structural Engineer) and Cynthia Song (Chief AutoCAD draftsperson).